INDEPENDENT WAREHOUSE ADVISORY · DURHAM REGION · GTA · SIMCOE COUNTY
TDTECH DIGITAL CANADAWAREHOUSE DATA & READINESS
03 / ROBOTICS & AMR FACILITY READINESS

Know what the building can support.
Before you buy the robot.

An independent pre-investment review of wireless coverage, facility geometry, traffic flow and financial assumptions for warehouses evaluating autonomous mobile robots (AMRs) or material-handling automation.

WHY READINESS COMES FIRST

Robotics depend on more than the robot.

AMR projects can be affected by aisle width, floor condition, traffic crossings, rack locations, network coverage, charging locations, workflow handoffs and the availability of usable operating data.

We bring the available facility information together so your team can compare vendor proposals on a common set of assumptions. We do not select, sell, install or commission robots.

1
Facility & RF review

Evaluate floorplan constraints and wireless requirements relevant to the concept.

2
Traffic-flow concept

Model conceptual lanes, crossings, staging and bottlenecks for review.

3
Investment model

Compare agreed RaaS and capital expenditure assumptions over three years.

Readiness outputs
for the decision team.

Outputs are designed to inform the next conversation with your operations, IT, finance and selected implementation specialists.

FACILITY

2D Layout & Traffic Lanes

Included

Conceptual movement and staging layout using the available facility drawing and agreed workflows.

  • AMR route concepts
  • Traffic crossing flags
  • Layout assumptions
Discuss the audit ↗
CONNECTIVITY

Wi-Fi / RF Readiness

Included

A predictive view of relevant wireless coverage and roaming requirements.

  • RF heatmap model
  • Coverage risk areas
  • AP planning notes
View Wi-Fi audit ↗
FINANCIAL

Three-Year RaaS vs. CapEx

Included

An editable workbook to compare agreed cost, utilization and operating assumptions.

  • Three-year cost comparison
  • Sensitivity assumptions
  • PSR trigger pre-screen for independent follow-up
  • No guaranteed ROI
Discuss the audit ↗

Important scope boundaries

Not an engineering or safety certification. Robotics readiness work is a preliminary informational review. It does not approve a robot, certify a facility, assess machinery safety, design guarding, validate emergency-stop functions or determine legal compliance. Any statutory PSR obligation under Ontario Regulation 851 must be assessed separately for the specific equipment, process and circumstances by the client with an appropriately qualified professional. We do not perform or seal a PSR. Installation, commissioning and final system validation remain with the selected qualified vendors and professionals.

Evaluate the facility
before the equipment.

Build a clearer, vendor-neutral picture before committing to an AMR or automation contract.

Start a readiness conversation ↗